Done
Quests to turn in. The step completes once all listed quests are handed in. If using DoneDB, keep a base Done field as well.
- 值的格式
- table
- 適用範圍
- step
技術說明保留英文原文。欄位名稱與 Lua 範例維持不變。
範例
原始檔範例。請依照你的路線替換 ID 與數值;本網站不會執行 Lua。
Lua · 01
Done = { 12345, 12400 }行為與詳細資訊
Forms shown in the documentation, not an exhaustive runtime schema. Constant runtime types are not inferred.
Parallel reward groups
| Case | Required behavior / syntax |
|---|---|
| Ready, unturned-in quest | conditions = { IsQuestOnQuest = 93384, IsQuestReadyForTurnIn = 93384, IsQuestUncompleted = 93384 } |
| Reward available above a threshold | Use MinLevel, rather than BeLvl, and add Zones when activation should wait for a visit to the reward map. |
| Independent rewards | Use separate groups for independently available hand-ins; a single Done list waits for every quest. |
| Pending hand-ins | Automatic turn-ins listed in pending groups wait for activation; manual turn-ins and the modifier override remain available. |
| Side objectives | Use Fillers during other steps; add a Qpart before Done for unfinished objectives. |
| Character restrictions | Keep shared eligibility on the route; child steps and prefabs need only additional restrictions. |
Action / Progression Options
An action waits for completion; a failed step condition skips the step. Use one main action per step.
Main actions
Use separate SellItems and Repair steps with the same coordinates; only one main action per step.